Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Intelligent Power Supply for Test Transformer

Published: 2019-10-06 09:27:43

Views: 2922

Category: Transformer Test Transformer

Product Description

Introduction to Intelligent Power Supply for Test Transformer:


1    Power Supply Voltage    AC 220V

2    Capacity    0-5KVA

3    Output Voltage    0—250V

4    Voltage Accuracy    ±0.5

5    Current Accuracy    ±0.5

6    Display Method    5-inch true color high-definition digital screen

7    Touch Method    Resistive touch for more precision

8    Operation Mode    Automatic, Manual

9    Data Storage    60 groups

10    Password    Multi-level permission settings

11    Multi-level protection for safer use

Input voltage protection    Input current protection    High voltage protection

High voltage current protection    High voltage overvoltage protection    High voltage flashover protection

Manual Operation:

①Close the power supply, the system enters the main interface. Set relevant parameters according to the test object (the parameter settings for manual operation are the same as for automatic operation. After setting parameters, click the "Start Test" button on the main interface to enter the test interface, then manual test can be performed). After setting parameters, press the "Start" button on the main interface, the contactor closes, and the system can perform jog voltage boosting.

②Press the "Boost" button, closely monitor the changes in high voltage until the voltage rises to the target value. At this time, the system will automatically start timing. After the specified time is reached, the system automatically returns to zero, and the device will emit a beeping sound, indicating that the test object is qualified. The printing operation method is the same as automatic.

③The manual timing button can be enabled at any voltage.

VI. Operating Conditions

1. Ambient temperature: 0~40℃

2. Altitude: <1000M

3. Relative humidity: <85%

4. The use site should be free of gases, vapors, chemical dust, and other explosive and corrosive media that seriously affect insulation.

VII. Brief Troubleshooting

Fault Phenomenon    Cause Analysis    Troubleshooting Method    Remarks

No display on power-on    1) Power not connected    Connect power    When replacing the fuse, use the same model; do not substitute with other types.

    2) Instrument fuse not installed properly or open circuit    Reinstall fuse or replace fuse    

Output voltage cannot reach rated value    1) Input voltage mismatch    Use voltage according to nameplate    

    2) Check if there is current indication on display    Display value greater than set value    

No current or voltage indication    1) Internal plug-in loose    Check equipment

Eliminate fault    

    2) Open circuit fault in test loop    Check test loop and eliminate open circuit fault    

VIII. Precautions

For your safety and the safety of the equipment, please read the following carefully:

1. The casing must be reliably grounded during testing.

2. Do not place unrelated items on the equipment panel or around it during testing.

3. Check the power supply voltage before use.

4. When replacing fuses and accessories, use the same model as this instrument.

5. This instrument should be protected from moisture and oil contamination.

6. Ensure the device under test is powered off and disconnected from other live equipment before testing.

IX. Maintenance and Repair

1. Verify equipment usability

Before using the instrument, first observe whether the appearance is damaged. After powering on, check whether the LCD screen displays and whether the display is complete. For instruments that have not been used for a long time, also check whether the output terminals are corroded or aged; if so, clean them before use. When using, refer to the "Operation" method.

2. Equipment maintenance

After each test, clean the connections on the instrument terminals, turn off the power, unplug the power cord, and place it in a dry, dust-free, ventilated room without corrosive gases.

X. Transportation and Storage

1. Transportation

When the equipment needs to be transported, it is recommended to use the company's instrument packaging wooden box and shock-absorbing items to avoid unnecessary damage during transportation and prevent unnecessary losses.

When the equipment is transported without a wooden box, stacking is not allowed. When using the company's instrument packaging box, the maximum stacking height is two layers.

During transportation, the panel should face upward.

2. Storage

The equipment should be placed in a dry, dust-free, ventilated room without corrosive gases. Without wooden box packaging, stacking is not allowed.

When storing, the panel should face upward. Place moisture-proof items under the equipment to prevent moisture.

XI. Unpacking and Inspection

1. Unpacking precautions

Before unpacking, ensure the arrow mark on the outer packaging is facing upward. When unpacking, do not hit it forcefully to avoid damaging the equipment. Remove the equipment and keep the outer packaging and shock-absorbing items for future transportation and storage, which is also environmentally friendly and energy-saving.

2. Inspection content

After unpacking, remove the equipment and check the equipment and accessories according to the packing list. If any shortage is found, contact our company immediately, and we will provide timely service.



XII. Others

This product is warranted for one year, with "three guarantees" (repair, replacement, and compensation) and lifetime maintenance. During the warranty period, any quality issues of the equipment will be repaired free of charge. For damage caused by improper operation or negligence, preferential service will be provided.

We look forward to your valuable feedback on our products. After receiving the equipment, please fill in the "User Feedback Card" and send it back to our company promptly. We will establish a user file for the equipment you purchased to provide faster and better service.

If your company address or contact information changes, please notify us in time so that we can provide tracking service. 

XIII. Packing List

1. User Manual                               1 copy

2. Product Certificate                               1 copy

3. Power Cord                                   1 set

4. Product Test Report                             1 copy

5. Fuse                                       5 pieces

Overview

This product is a special supporting equipment for the test transformer produced by our company. This control box has the characteristics of easy use and maintenance, superior performance, safe and reliable use, beautiful appearance, sturdy and durable, and easy to move. It is essential equipment for power supply enterprises, large factories, metallurgy, power plants, railways, and other departments requiring power maintenance. This product adopts microelectronic processing technology, and all processes can be set in advance. It has a full Chinese interface and is simple and clear to operate. After all test items are set, the test is automatically performed without manual intervention.



Test Transformer 50kV/5kVA
WeChat QR Code
💬
💬 Message

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us